CIR Experience

Ann Arbor Skyline High School: Installation of (12) strand fiber optic cable to (10) IDFs, (1100) drops of category 6 cable, (82) individual sound fields, a PA system and projector cables, VGA, Video and S- video feeds.  

Ferndale Electric: CIR has done multiple installs and troubleshooting of fiber optic cables requiring connectors terminated or fusioned splices at many of the General Motors plants in the area. CIR has done many projects with Ferndale.

County of Monroe: CIR has been doing regular adds, moves and changes throughout the City and County Buildings, as well as aeriel repairs to the WAN fiber optic cable network. 

Saline Area Schools.   Installation of Cat6, fiber optic. and .500 hardline at the new Harvest Elementary and New Saline High School as well as, new cabling throughout all the other school buildings in the district. The High School had (3600) drops of category 6 cable(400,000’), (10,000’) 12 strand fiber optic cable, (26,000’) RG6 cable, (4200’) .500in coax and (77) projector locations using the CMJ445 ceiling plate. There were (14) IDFs and (1) MDF.  

Telsystems: CIR has done multiple installs at school districts, colleges and most recently installed Broadcast cabling at the U of M Football Stadium, Crisler Center and Yost Ice Arena.

AFSmith Electric: Installation of communication system infrastructures at Washtenaw Community College and other facilities.

University of Michigan: CIR has been part of multiple projects under university personnel as well construction managers. 

Steve Swartzinski is the president and project manager for CIR, Inc.  Steve is the main contact for all inquiries regarding any projects, including accounting issues. Steve can be reached by filling out the Contact Us form on this website.